全国十大赌博官网-十大网赌信誉平台

President of Afghanistan Witnesses the Signing of Contract for Road Repair and Renovation Project in Afghanistan by CRBC

Chinese Premier Li Keqiang and President of the Philippines Rodrigo Duterte inaugurated the projects undertaken by CRBC in Philippines

Senegal President Macky Sall Visits THIES-TOUBA Toll Expressway Project

CRBC President Du Fei Visits Alpha Condé President of the Republic of Guinea

Tajikistan President Praises Shura-Angelo Road Rehabilitation Project undertaken by CRBC

News Releases
  •   03/29/2021

    The Main Line of Togo No. 34 National Highway Completed

    Recently, the asphalt concrete surface layer along the main line of the Rehabilitation and Reinforcement Project of No. 34 National Highway in Togo undertaken by CRBC has successfully completed, and the whole line was connected.
  •   03/26/2021

    The New Chairman of Georgian Highway Authority Inspected the F3 Bid Section of E60 Highway

    On 18 March, the new Chairman of the Highway Authority of the Ministry of Regional Development and Infrastructure of Georgia, George Zeletley, visited the F3 Bid Section of the E60 Highway Project.
  •   03/22/2021

    Qualification Exam for Kenyan Train Drivers was Launched

    Recently, Kenya Railway Authority and Africa Star Railway Operation Co., Ltd. jointly organized the qualification examination for Kenyan SGR train drivers.
  •   03/15/2021

    Asphaltic Concrete Wearing Course Pavement of art of Eindu-Kawkareik Road Project Completed

    On March 11, the Asphaltic Concrete Wearing Course Pavement of the Eindu-Kawkareik Road Improvement Project in Myanmar was successfully completed, and the construction of the Project won a phased victory, making a decisive step for the subsequent smooth handover.
  •   03/01/2021

    Successful Installation of the 10,000-ton Main Bridge

    On February 26, the 12000-ton-gross-weight main bridge of the Cross-Bay Bridge in Tseung Kwan O, Hong Kong completed the installation successfully by using integral floating support method, making a significant breakthrough in the construction of the Project. The Director of Civil Engineering and Development, Mr. LAU Chun-kit, Ricky, JP.visited the site to cheer up the project team.
  •   03/01/2021

    Main Pier Tower of Peljesac Bridge in Croatia Completely Capped

    On February 27, the concrete placement of the last section of Pier S9 of Peljesac Bridge Project in Croatia was completed, and all the six cable towers of the bridge were successfully capped, marking that the main works of the bridge have been completely transferred to the new stage of construction of steel box girder and stay cables.
Total: 1301  Head Prev Next Tail   1 / 217  To   GO 

全国十大赌博官网|十大网赌信誉平台

XML 地图 | Sitemap 地图